The Sweet Homes building warrant checker is a free self-serve tool for homeowners planning alterations in Edinburgh. Six questions cover internal walls, drainage and sanitary fittings, heating appliances, listed or conservation status, tenement shared parts and changes of use. The result points to questions for the verifier, planning authority, solicitor, factor or the professionals the homeowner appoints. It is guidance, not a determination.
In Scotland, the local authority acts as verifier for building warrants and accepts completion certificates. Schedule 3 of the Building (Scotland) Regulations 2004 identifies work that may not require a warrant, subject to its conditions and exceptions. Property details and the proposed design can change the route, so the appointed architect or warrant professional should confirm it with the verifier before work starts.
The checker runs entirely in the browser. The answers are not submitted or stored.
Source: Building (Scotland) Regulations 2004, schedule 3
“Brunon does a clear and thorough written quotation before the work, so you know exactly what is expected.”
Verified Google review
Sweet Homes is the contractor. The company checks buildability and prices construction from the approved drawings, specification and other information supplied through the homeowner’s appointed team.
